![]() - Page 1 of 3 - |
![]() |
Place and spread crushed gravel—the same material used locally for road-base aggregate—into the excavated trench. Compact the gravel to a smooth and level surface. This is usually done with a vibratory plate compactor. If desired, place a thin layer of sand on top of the pad for final leveling. The sand will help to adjust the level of the base-course units. When completed, the leveling pad should be at least 6 inches thick. Leveling Pad continued on next page
|
![]() |